Well, this is my tiny little shop where i'm putting my huge giant clearvue cyclone.
It's 18' by 15' with a jumble of partitioned walls in one corner. On the other side of this wall is our picture frame shop. i'm setting up a lutherie in this little space. The square in the lower right quadrant is a 6' loft on top of which we sleep. when i get this cyclone hooked up i'll be able to start using some of these machines and i can start restoring the vintage camper trailer we're going to move into.
from the cyclone to the back edge of the tablesaw is 17'. could i put 2 wyes right together coming out of the cyclone to go straight down to the sanders and over and under the loft to the planer, lathe and jointer? since i'm not going to really have a production shop i was thinking i could use one flex tube between the 3 machines under the loft and one tube between the 3 sanders. then one more wye for the bandsaw run...an elbow down and split into 2 4" flex tubes. then an elbow down to the tablesaw and router again split to two flex tubes.
can anyone make sense of this? i guess a sketch of the duct layout would help, but just want to make sure i am on the right track?
thanks a lot,
andy
It's 18' by 15' with a jumble of partitioned walls in one corner. On the other side of this wall is our picture frame shop. i'm setting up a lutherie in this little space. The square in the lower right quadrant is a 6' loft on top of which we sleep. when i get this cyclone hooked up i'll be able to start using some of these machines and i can start restoring the vintage camper trailer we're going to move into.
from the cyclone to the back edge of the tablesaw is 17'. could i put 2 wyes right together coming out of the cyclone to go straight down to the sanders and over and under the loft to the planer, lathe and jointer? since i'm not going to really have a production shop i was thinking i could use one flex tube between the 3 machines under the loft and one tube between the 3 sanders. then one more wye for the bandsaw run...an elbow down and split into 2 4" flex tubes. then an elbow down to the tablesaw and router again split to two flex tubes.
can anyone make sense of this? i guess a sketch of the duct layout would help, but just want to make sure i am on the right track?
thanks a lot,
andy
Last edited: