bassplugger
New member
I have a 1800 ordered and 3 weeks wait time. So now planning duct layout and wondering if you can run low voltage wire to where each blast gate is to be installed and wire a switch (maybe doorbell switch?) at each of those locations to turn DC on and off. Don't know it that is a good idea or not, or even if it will work. Any thoughts of ideas from you guys will be appreciated.
Thanks,
Tim
Thanks,
Tim