tamathumper
New member
Once the blower housing and cyclone are mated and hung from the motor assembly, they are basically held in place by the six bolts with "toggle buttons" on them.
There's nothing in the instructions about caulking around the perimeter of that ring, but everything else gets caulked, so I can't imagine that gets left alone?
Are we supposed to loosen those bolts one at a time and caulk around that ring? If so, that's going to be a righteous PITA now that it's all hung up there on the wall.
There's nothing in the instructions about caulking around the perimeter of that ring, but everything else gets caulked, so I can't imagine that gets left alone?
Are we supposed to loosen those bolts one at a time and caulk around that ring? If so, that's going to be a righteous PITA now that it's all hung up there on the wall.